Correct operation methods of RO plant

            HYWATER        Reverse Osmosis plant/system

Correct operation methods of RO plant


Steps need to be noticed when install the new RO membrane of RO plant

1. First, backwash and rinse the quartz sand and active carbon to make then clean

2. Detect if any residual chlorin in water that may oxidize the membrane. If the residual chlorine exceeds the standard, it need to solved first before installing the membrane.

3. After the membrane be installed, soak the membrane for 1-2 hours, because the soaked membrane is relatively moist then will not be damaged by high pressure.

4. Then start the high pressure pump, the pressure will increase steadily

5. The product water of the first half an hour must be drained, as the protection liquid be added in membrane which smell bad

 

When should we process Chemical cleaning for RO membrane of RO plant

1. Product water flow decrease more than 10%

2. Product water quality (conductivity) decrease more than 10%

3. The operation pressure increase more than 10%

4. Above situation can not be improved by physical cleaning

 

Other reasons shall be considered before processing Chemical cleaning for RO membrane of RO plant

1. The damage of pressure controller and high pressure pump

2. Inlet water temperate or quality changed greatly because of season change

3. The pretreatment of RO plant is blocked or damaged

4. The membrane element or O-ring seal of the pressure vesselbe damaged

 

Common pollutants in RO membrane of RO plant are mainly CaCO3, CaSO4, BaSO4, SrSO4, metal oxides, silicon deposits, organic matter and biological slime. Different pollutants cause different degrees of damage to the membrane, thus the chemical cleaning agents shall be customized for the specific pollutant.

 

How to process Chemical cleaning (CIP) for RO membrane of RO plant

1. Preparation work: adjust the corresponding valves

2. Acid cleaning: prepare 100-500L clean water with 0.1% HCL in CIP tank, and process circulation

3. Alkali cleaning: prepare 100-500L clean water with 0.1% NaOH in CIP tank, and process circulation

4. Clean water cleaning: adjust the corresponding valves

 

More inquiries related to RO plant please contact:

Mob& Wechat& WhatsApp: (+86)13544774483

Email: sales010@water-sy.com

 

We will provide high-quality, all-round comprehensive professional services for project consulting, system design, manufacturing, installation and commissioning, personnel training, etc

Prev: How to adjust Pressure switch of RO plant

Next:Why add inhibitor dosing for Reverse osmosis system

©2121 HY water, Ltd All Rights reserved.
Industrial & drinking Reverse osmosis water purification system,Seawater desalinaton plant in Africa, Asia, Europe, South America, Australia |Made in China by Haiyuan. an ISO9001:2019 Certified Company Add: Xiansha Gaobu Town,Dongguan city,Guangdong,China|+86(769)88706055| Email:sales@seawaterroplants.com
HaiyuanHaiyuanHaiyuan
Need Help? Chat with us
haiyuan